In the present deliverable, the results of the workshop ‘UMBRELLA Workshop on Optimized Solutions’ and ‘UMBRELLA Workshop on System State Modelling and Toolbox Design’ are summarized. The workshops were both hosted at ENTSO-E’s premises on October 22, 2013 and October 23rd, 2014 with a total number of 15 and 33 registered participants respectively, including experts from industry, academia and regulatory bodies
This report (deliverable) named D6.1 Design of solution is deliverable of WP6 within InterFlex H2020...
This is a report of the TIMEPAC-21 workshop “Dynamic EPC as enabler of Smart Energy Services – Energ...
International audienceThe cluster of competencies CapEnergies in cofounding with the PACA region lau...
In the present deliverable, the results of the workshop ‘UMBRELLA Workshop on Optimized Solutions’ a...
In the present deliverable, the results of the second common ‘Workshop on intermediate results’, co-...
This deliverable presents the results of the first common workshop, co-organized by UMBRELLA and iTe...
This deliverable summarizes the content of the FP7 project UMBRELLA. It describes the objectives and...
This deliverable is a halfway summary of the FP7 project UMBRELLA. It describes the objectives and t...
A workshop on the global high‐resolution demonstrators was held in conjunction with the annual meeti...
<p>a) device allocation for ∼40 MW alternative, b) device allocation for ∼100 MW alternative, c) dev...
To disseminate the results generated by the project and to raise awareness of the needs for standar...
The TrialsNet project aims to implement large-scale trials of innovative Beyond 5G mobile network (B...
This document is the deliverable D7.4 of the project POLYPHEM. It is planned in the framework of the...
This is a report of TIMEPAC-22 International Workshop “Enhancing energy performance certification to...
This report (deliverable) named D6.2 Implementation of solution is deliverable of WP6 within InterFl...
This report (deliverable) named D6.1 Design of solution is deliverable of WP6 within InterFlex H2020...
This is a report of the TIMEPAC-21 workshop “Dynamic EPC as enabler of Smart Energy Services – Energ...
International audienceThe cluster of competencies CapEnergies in cofounding with the PACA region lau...
In the present deliverable, the results of the workshop ‘UMBRELLA Workshop on Optimized Solutions’ a...
In the present deliverable, the results of the second common ‘Workshop on intermediate results’, co-...
This deliverable presents the results of the first common workshop, co-organized by UMBRELLA and iTe...
This deliverable summarizes the content of the FP7 project UMBRELLA. It describes the objectives and...
This deliverable is a halfway summary of the FP7 project UMBRELLA. It describes the objectives and t...
A workshop on the global high‐resolution demonstrators was held in conjunction with the annual meeti...
<p>a) device allocation for ∼40 MW alternative, b) device allocation for ∼100 MW alternative, c) dev...
To disseminate the results generated by the project and to raise awareness of the needs for standar...
The TrialsNet project aims to implement large-scale trials of innovative Beyond 5G mobile network (B...
This document is the deliverable D7.4 of the project POLYPHEM. It is planned in the framework of the...
This is a report of TIMEPAC-22 International Workshop “Enhancing energy performance certification to...
This report (deliverable) named D6.2 Implementation of solution is deliverable of WP6 within InterFl...
This report (deliverable) named D6.1 Design of solution is deliverable of WP6 within InterFlex H2020...
This is a report of the TIMEPAC-21 workshop “Dynamic EPC as enabler of Smart Energy Services – Energ...
International audienceThe cluster of competencies CapEnergies in cofounding with the PACA region lau...